TECHNICAL GUIDE
Mission Planner · MP-03

Deploy a Network Switch

Choose a switch from System Arsenal, deploy it, and adjust deployment parameters such as port count.

NETWORK

Add switching to the canvas

Open System Arsenal, select the required switch, and add it to the active datacenter. The deployment panel lets you set the port count and other switch-specific options before placement.

After deployment, the switch becomes a canvas object that can be wired to/from networks and systems.

PROCEDURE

Procedure

STEP 01

Deploy Switch From System Arsenal

Open System Arsenal, select the required switch, and add it to the active datacenter.

FIGURE 01Deploy Switch From System Arsenal
STEP 02

Configure Switch Ports

Set the switch port count and any deployment-specific network options before saving the switch to the canvas.

FIGURE 02Configure Switch Ports
RESULT

The outcome you should see

The switch is present on the canvas with the requested interface count.